INSTALLATION & OPERATION MANUAL MODEL NUMBERS: 25-PDV 55-SHP22 55-TRP22 Thank you for purchasing this product from a fine line of heatin
10OPERATING INSTRUCTIONS CAUTION: DO NOT OPERATE WITH THE DOOR OPEN. If door is left open (approximately) two minutes, unit will stop feeding and f
11E-Codes “E-Codes,” or Error Codes, are codes that will appear in the Heat Range and Blower Speed windows of the Control Board if your unit experien
12DAILY OPERATION Refueling the Unit Always press the “OFF” touch pad before refueling. This stove has a (approximately) 60-lb. hopper, and should b
13 ASH REMOVAL AND DISPOSAL IMPORTANT: While the amount of ash generated by this unit is not excessive compared to log-burning woodstoves, keepi
14Monthly Ash Removal The large baffle plate (12-5/8” x 9-3/8”) that rests above and behind the burn pot (refer to the section on “Proper Impingement
15MAINTENANCE CAUTION: UNPLUG THE UNIT PRIOR TO ANY SERVICE WORK! SEE EXPLODED DIAGRAM (ILLUSTRATION 6) FOR PARTS REFERENCE Parts Orders: (800) 5
16Convection Blower The Convection (room air) Blower (Part # PU-4C447) is located on the left side of the unit and can be removed by disconnecting th
17 “Door Ajar” Vacuum Switch Port If necessary, remove right side louver to determine where vacuum por
18Control Board The Control Board (Part #PU-CB04) is a digital read-out board. This board offers a wide variety of settings to operate the unit. Th
19 CAUTION: Moving Parts May Cause Injury. Do NOT Operate with Panel(s) Off. DANGER: Parts May Be Hot. Risk of El
2A letter from our Technical Support department: Thank you for purchasing this fine product from England’s Stove Works! England's Stove Works
20Adjusting Hopper Lid Latches The seals around the top of the pellet hopper are important to safe an efficient operation of the unit. The latches i
21ACCESSORY ITEMS The following accessories can be added to your unit at anytime after purchase; however, let the unit cool down before adding any a
22REPLACEMENT PARTS, ACCESSORIES AND OPTIONS AC-GGK Glass Gasket Kit (gasket only, no glass) AC-DGKC Door Gasket Kit (#2 on diagram) AC-114 Bra
23 Pellet Stove – Exploded View DiagramIllustration 6 Unit Dimensions: 28 ½”W x 30”H x 28 ½”D
24TROUBLE-SHOOTING GUIDE WARNING: TO AVOID ELECTRICAL SHOCK ALWAYS DISCONNECT THE UNIT FROM THE POWER SOURCE BEFORE ATTEMPTING ANY REPAIR. IF THIS
25 You may write your unit’s Manufacture Date and Serial Number in the blank spaces on this sample tag,
26Have this information on hand if you phone the factory or your dealer regarding this product. Retain for your files: Model Number _______________
27WARRANTY REGISTRATION for England’s Stove Works Purchased by (Name) ______________________________________________ Address ______________________
3BEFORE RE-STARTING YOUR UNIT Every time before pressing “ON” to start your unit – Be sure to remove all ashes (burnt or partially burnt) from your
4IMPORTANT INFORMATION 1. Check local installation codes for your area. Call your Homeowner’s Insurance representative for inspection of your stov
5 14. Do not allow paint, chemicals or construction dust on or near your unit. Do not allow liquid or ANY foreign materials on or inside your unit.
6Proper Impingement (Baffle) Plate Placement in Pellet Stove Firebox Occasionally in shipping, the impingement (baffle) plate may shift out of its
7FLUE SYSTEM Caution: Follow the pipe manufacturer’s installation instructions and directions for passing through combustible walls and ceilings. Be
8Through the Ceiling When venting the stove through the ceiling, the pipe is connected the same as through the wall, except the clean out tee is alwa
9 FLOOR AND WALL PROTECTION Floor Protection If your floor is constructed of a non-combustible material such as br
Comments to this Manuals